London South Airport (LSA)

Hi fellow CEO’s

Following on from the success of London Stevenage Airport

London Stevenage Airport

and Reykjavik International Airport

Reykjavik International Airport

Power Airports International have purchased a small airport in Northern France, near the town of Calais.

Formally Calais International Airport, Power Airports have re branded as London South Airport, only a short 1 hour 30 ferry ride to Dover, and then a 2 hour car ride to central London, thats right I hear you cry, from landing you can be in central London in under 4 hours!

So what have we purchased…

Calais International Airport was a small single story terminal with 14 small stands, 4 medium stands and 6 general aviation stands.

We purchased this airport just after an earthquake stuck, locally known as Alpha 33. The airport sits between 2 plates and as a result of the earthquake the runway shifted, causing it to be miss aligned with the exits, so our first job was to relay these exits to enable operations again.

With the runway exits fixed and operations resumed money is starting to come back in.

We have a new master plan in place to upgrade the facilities and modernise the terminal. I will update when construction is complete on phase 1.

See You Soon!

6 Likes

“earthquake known locally as Alpha 33”

To quote Bill Wurtz: ‘yeouch’

1 Like

like the alpha 32-33 reference with the runways

Phase 1 is now complete…

One of the main complaints we had was that passengers had to cart their own baggage to and from the aircraft, so out first investment was in a new basic baggage system, 2 baggage bays have been built one for the medium stands and the other for the small stands. To make way for the baggage handling and a new baggage claim area we have extended the terminal a little, revamped the toilets, and laid some new flooring.

In addition to the new baggage features we have a new cafe area and terminal entrance

and the last part of phase 1 was the completion of a new car park area and passenger pick up and drop off.

New Parking and drop off

Power Airports are dedicated to bringing new and exciting features, so phase 2 is well under way and we have been approved planning permission for a new upgraded runway, taxi ways and a new control tower.

Join us soon for the next update!

1 Like

Nice Airport

1 Like

Phase 2 is now complete, and after a short closure we have increased our runway and widened our taxi ways to handle the biggest of aircraft.

And also we have built a new state of the art control tower

2 control tower

As a result of the new runway and taxiway our general aviation facilities have sadly closed, and we have also lost 2 of our small stands. A small price to pay for the development.

This completes Phase 2.

All that remains for us is to wish you all from Power Airports a Merry Christmas.

2 tree

2 Likes

I’m going make a London south west airport (Located in Canada)

Haha, Ryanair would be all over that!

1 Like

But did I mention it’s in Vancouver?

1 Like

Development never stops, and in preparation for phase 4, we have built a new fuel farm

3 Fuel farm

added a new large remote stand

3 Large stand

and extended the terminal a little for a new gate area.

3 terminal extension

We have also had some sad new, one of our major airlines Stripe Airlines have ceased trading as of midnight last night, as the last aircraft departed this left a big hole in our flight planner.

We are in the early stages of negotiation with some other airlines interested in getting into the London market, so watch this space!

Despite the loss of one of our major airlines, we are still planning on major expansion. Phase 4 will include a new terminal area with direct access to some medium stands.

See you soon!

Phase 4 is here!

In our last update we said about the unfortunate demise of Stripe Airlines, to fill the gap left our sales team went speaking to new airlines and Swiftly agreed to a select few charter flights, first of all was a morning arrival from Brazil, operated by a 747, and then in the afternoon we had a 787 service from Asia.

Charter

Swiftly said that if the charter flights go well they may start a new contract for scheduled services.

Back to the airport and In this update we have added 4 new medium

An upgraded security check point

4 security

a new baggage and shop area

And the new gate area

We have come miles since we took over operations. Phase 5 is on the cards, and we are speaking with the local authorities for the next phase.