Welcome to a fictional Copenhagen Airport (CPH)
Hello my name is Henrik. I spent so much time on this.
Now i need the approval of the inspection team, and saftey checks to be done!
So i need your help, to check if i missed something.
I went with Copenhagen Airport becuse the names make the most sense, and it’s a big airport.
STATS:
Copenhagen Airport
Airport Code: CPH
RUNWAYS 2, @ 1000m
Terminals: 3
GATES: 38
Small stands: NO
GA: NO
CHECK-IN DESKS: 76
EMPLYEES: 7 - All Boardmembers
So please check the pics. Tell if i missed something.
Or if should change something? Why?
If you want more pics of something specific just let me know.
Comment or ask anything you like.
Give me tips and stuff.
Everything should be finsihed.
Everything should be connected.
Everything Operational I.E rooms, gates, parkings, depos and so on. All that have been renamed to fit the airport and easy to locate.
Checked all the boxes at every room.
I have a few questions.
-
I can not change the direction of the escalators. I assume this is something that just needs patching and not me missing something. When i right click nothing happens.
-
How should i name the gates. There is many options.
One. I can go for a few number of gates. And have many letters.
I.E A 1-4. B 1-4, C,D,E,G 1-4
Two. I can have Frewer Letters and higher numbers.
I.E A 1-15, B 1-15, C,D,1-4
If you have a new way or another idea, please tell me. -
The connection between the main terminal and the Island (Terminal 3) is a tunnel atm.
Should it be a tunnel or sky bridge? And why? -
When placing a stand. it removes two tiles of wall on the 0 floor. So i then uprgaded with Jetway, so it connected to floor 1.
The holes in the wall on floor 0 was still there after i upgraded with Jetway. So i went ahead and filled thoose gaps in with wall.
It did not affect the 1’floor where the gate actually is attached.
Does anyone know why it removes two tiles of wall when you place the stand, and why they are still there after upgrading to Jetway.
Or is this just something that’s needs patching?
Future development planned for.
De-Icing will come south of the RWY.
Catring and Cleaning will have space.
I did not place small stands becuse i don’t see the use for them in this layout. You can easely implement this yourself if you want. Or when we get more space.
I would like 4 remote stands, but i don’t have the space atm. Can you find space? Or i will implement it when we get more space.
I will put this on the workshop after i got the feedback and when i fell done.
They need to fix the escaltors before i put it up i think.
And there i will aslo add a description how to play with minimun delays.
There is a layout plan.
Thank you for reading/responding.
/Henrik - Sweden