Hello fellow ACEOs!
Today i present you my latest creation, Boston John Adams International Airport (BSA), built to ‘ease’ the larger Logan airport, mostly serving the smaller domestic market. It currently has 14 medium stands, although in the future will expand to around 28 gates (awaiting underground tunnel), 3 runways and one reserved for GA, although soon will be extended to accommodate jets. Lacking by ACEO standards, but my old laptop will burn if i expanded it to the target (28 gates) now. So while waiting for my PC to come back, enjoy this little airport!
I assume you’re also planning to add some remote stands? I think it would be nice if you put them near the GA stands or do you already have a plan for that?
Oh and are the runways full length? They do look really long
For remote stands, i will put it south, turning right from main road, below runway 09R/27L, maybe with a small terminal, and a new 18/36 runway, maybe ~1300 m
And for the runway length:
09R/27L and 09L/27R : 2200 m
18/36 : 1400 m
10/28 : 1000 m, later to 2000 m